Places for People has appointed more than 40 contractors to a national groundworks framework worth around £246m over four years. For firms across Essex, Kent and London, this is not just another procurement announcement: three of the 13 regional lots directly cover Moyak’s local patch.
Coinford Central and RJ McLeod lead the appointed contractors, each securing places on six lots. M&J Evans Construction and Houlihan & Co won four lots each. Other appointed firms include MV Kelly, Erith, Tamdown, O’Halloran & O’Brien, Chasetown Civil Engineering, A D Bly Construction, JLC Groundworks and Kingsheath Construction.
The work can range from site clearance, bulk earthworks and foundations to drainage, utilities, roads, sewers and external works. That breadth matters for insurance. A business moving from occasional jobs to several kinds of groundworks, across multiple sites and over a four-year framework, may have a different risk profile from the one its policy was based on.
The Construction Enquirer reports Greater London as the largest package at around £38m, followed by Berkshire, Hampshire and Dorset at around £30m, and East Anglia and the northern Home Counties at around £29m. The South East South lot covers Surrey, Kent and the two Sussex counties. The South East East lot includes Essex, alongside counties further north and east. Together with London, those regional lots bring the framework close to home for many contractors.
A place on a framework does not necessarily guarantee a specific volume of work. But it can put a contractor in the running for repeated call-offs, and those projects can bring requirements that deserve attention before mobilisation.
1. Review your declared work profile
A framework appointment can change how a business operates, even before the first call-off lands. Over four years, a contractor may take on bigger contract values, different activities, more sites at once or work in regions it has not previously declared.
Insurers assess risk based on the information given about a business: its work, turnover, use of subcontractors and other relevant details. If the declared picture no longer reflects the work actually being done, there may be a gap between the cover arranged and the business’s current activities.
I think the sensible response to a framework appointment is a cover review, not an assumption that an existing policy will automatically stretch to fit. A broker should understand the range of work in the framework and how the business expects to deliver it. That includes foundations, drainage, utilities and any design or advisory work, rather than relying on a broad label such as “groundworks”.
Our guide to Construction Contractor Insurance explains why the details of a contractor’s activities and projects matter when arranging cover.

2. Allow for concurrent sites and local exposures
The three lots relevant to Essex, Kent and London could involve work across a large and varied area. Winning contractors may be working near existing homes, roads, public land and occupied premises, potentially with more than one site active at the same time.
That brings practical insurance questions. Does the public liability cover reflect the scale and nature of the work? Is contract works cover suitable for the value of work in progress across all active locations? Are materials stored on or away from site included as required? If plant is hired in to meet a peak in demand, has the insurer been told and is the relevant cover in place?
The answer depends on the policy wording and the contractor’s circumstances. A framework name or site list alone does not settle it. For firms arranging Business Insurance Essex or Business Insurance London, the broker needs to understand where the work is happening and how the sites will be managed.
3. Treat framework compliance documents as useful insurance evidence
Prequalification forms, health and safety accreditations, insurance schedules and inspection records are often seen as procurement paperwork. They can also help explain the business to an insurer and show how risks are managed.
Check the framework’s insurance requirements against the limits and cover actually arranged. Employers’ liability insurance of £10m is a common framework requirement, but firms should confirm the specific terms for their own appointment. Employers’ liability is generally a legal requirement where a business employs staff, subject to the applicable rules and exceptions. Professional indemnity may also be required where a contractor takes on design responsibilities.
Keep certificates and schedules current, and make sure they identify the correct business and cover periods. It is worth checking that the policy’s stated activities are consistent with the framework submission and that any contract-required limits are not being mistaken for a complete review of cover. An insurance limit on a certificate does not, on its own, confirm that every activity or contractual obligation is insured.
Inspection regimes are useful evidence too. Keep records that reflect what happens on site, including checks for plant, temporary works and site conditions where relevant. The more clearly a contractor can describe how it manages risk, the easier it is to have a practical conversation about its cover.

4. Check the subcontracting chain before work starts
Framework winners commonly rely on specialist subcontractors for drainage, utilities, plot works and other packages. That can work well, but it needs clear arrangements about who is responsible for what and what insurance each party must hold.
The principal contractor should understand the difference between its own responsibilities and the subcontractor’s obligations. Check subcontractor insurance documents, policy dates, limits and the activities covered. Also be clear about how the subcontract is classified by your own policy. Labour-only subcontractors, in particular, may be treated differently from bona fide subcontractors under insurance policy definitions, which can affect declarations and cover.
This is a practical issue on each call-off, not just something to settle once at framework stage. Our earlier article on principal contractors, subcontractors and insurance lessons from a dumper overturn looks at why responsibilities and cover should be understood throughout the chain.
For a broader view of the cover a contractor may need, see Moyak’s page on General Contractor Liability Insurance.
5. Review the first call-off before mobilisation
The framework appointment is only part of the picture. Each call-off may have its own contract terms, insurance requirements, retentions and deadlines for reporting incidents or circumstances. Those terms can place obligations on the contractor beyond the framework-level documents.
Before mobilisation, have the broker review the insurance clauses in the first call-off and flag anything that may need action. That might include higher limits, specific extensions, a requirement to note another party’s interest, or a notification window that should be diarised. Do not assume that a certificate meeting the framework minimum automatically satisfies every call-off.
Also tell the broker if the business expects to operate multiple sites at once or has a significant increase in hired-in plant. A change in the scale or pattern of work is easier to discuss before it becomes urgent. Where a policy needs adjustment, allow time to confirm the terms with insurers rather than leaving the review until the site is ready to open.

Practical next steps
The framework award is an opportunity, but the insurance review should follow the work. Start by gathering the framework insurance requirements, the first call-off contract, your current policy schedule and a clear outline of the activities and sites you expect to take on.
Then check whether the declared work, turnover, contract values, subcontracting arrangements and plant use still describe the business accurately. Confirm the required limits and any design responsibilities, and make sure each call-off’s insurance and notification clauses have been reviewed before mobilisation.
Moyak works with contractors and businesses to assess insurance needs against their individual work and circumstances. If a framework appointment is likely to change your operations, speak to your broker early. That gives you a better chance of identifying gaps while there is still time to address them, rather than discovering a problem after the work has begun.
For businesses looking to combine relevant covers, you can also read about Commercial Combined Insurance. The right arrangement depends on the business and the policy wording, so it is worth checking what is included rather than assuming one package will meet every framework obligation.
Source: Construction Enquirer: Places for People names groundworks firms for £246m deal