Named on the Project Insurance, Liable for the Excess: What the Lower Thames Crossing OCIP Means for Subcontractors

Being named on a project insurance policy is not the same as being protected from every cost if something goes wrong. The question that matters is often much more immediate: who picks up the first slice of a loss?

That distinction matters for subcontractors considering work on the Lower Thames Crossing and the frameworks feeding it. This major programme runs through Thurrock and out towards Gravesend, bringing opportunities for businesses across Essex and Kent. But before signing a contract that includes joint names insurance or an owner controlled insurance programme (OCIP), subcontractors need to understand what the policy covers, what it does not, and who may be left paying the excess.

1. A project-wide policy, not a personal safety net

National Highways says construction on the Lower Thames Crossing begins in 2026, with the crossing due to open in the early 2030s. Its project pages list Balfour Beatty Civil Engineering for roads north of the Thames, Bouygues Travaux Publics–Murphy JV for tunnels and approaches, Skanska Construction UK as preferred bidder for the Kent Roads contract, Jacobs as integration partner and Turner & Townsend as commercial partner. The National Highways project information and supply chain pages describe the scale of the work and the opportunities for suppliers.

On 19 November 2026, a Find a Tender award notice was published for the follow-insurer layer of National Highways’ project-wide OCIP. The lot is described as £50m excess of £50m for public liability, for a contract period from 1 January 2027 to 31 December 2033. The notice names AIG, Allianz Global Corporate & Specialty and Arch Managing Agency as award recipients, and says follow insurers must provide cover in line with the appointed lead insurers’ contract of insurance policy.

That is a layer of insurance placed by the project owner. It is not, by itself, a statement that any individual subcontractor’s own insurance will respond to a loss, or that the subcontractor has no financial responsibility under its contract.

A project-wide programme is a sensible way to insure a scheme of this size. The important detail for a subcontractor is what the contract asks them to accept.

2. What OCIP and joint names cover usually mean

An OCIP is generally a single project-wide programme arranged by the employer or owner. It may cover several parties, including the owner, main contractor and subcontractors, as named or joint insureds. Instead of each party arranging duplicate cover for the same project risk, a central policy is intended to provide cover for the work under one programme.

In this kind of arrangement, insured parties are generally treated as one entity for insured losses. Claims are dealt with under the project policy and, normally, there is no subrogation between insured parties. That is, the insurer does not seek to recover a payment from another party insured under the same arrangement.

There can be real benefits for subcontractors: access to large projects, less duplication of contract works cover and protection from some claims being pursued between insured parties. As the Munro-Greenhalgh broker article explains, however, those benefits depend on the policy and contract working together. Being included as an insured does not settle who must pay the policy excess.

3. The double gap: no claim against you, but an excess to pay

The potential trap is a gap between the project policy and the subcontract.

If you are a co-insured on the project policy, there may be no liability claim against you for a loss covered by that policy, and the project insurer may have no right to pursue you through subrogation. If your own public liability or contract works cover depends on a claim being made against you, or on a loss falling within that cover, it may not respond. Whether it does depends on the policy terms and the facts.

At the same time, the subcontract may say that you must pay all or part of the project policy excess, especially where the loss is connected with your work. You could therefore face a contractual bill without a conventional liability claim that triggers your own insurance. That is the double gap: your own policy may not respond, while your contract still makes you fund the excess.

The Munro-Greenhalgh article reports examples of OCIP or project-policy property damage excesses of £50,000 and £100,000, sometimes significantly higher. It cites a £250,000 excess on the Crossrail contract in London, reduced by 50% for subcontract values below £10 million. These are examples reported by that broker, not market averages or a statement of the Lower Thames Crossing policy’s excesses.

The same article discusses Norwich City Council v Harvey (1989), in which the court held, in the circumstances of that case, that the employer bore the loss where the contract placed the risk on the employer and required insurance, even though the subcontractor had been negligent. The practical point is not that this resolves every dispute: liability may be affected by the insurance structure, while the contract may still allocate financial consequences such as an excess.

Diagram showing how a contract may pass an excess from the employer through the main contractor to a subcontractor

4. What may still need your own insurance

An OCIP should not be treated as a replacement for every policy your business may need. The scope and eligibility rules vary, so check the actual wording and contract.

The Forbes Solicitors overview of OCIPs notes that commercial motor is typically excluded, while off-site contractors, materials vendors and haulage are usually not eligible. Other exposures to check include:

  • Employers’ liability: this remains the subcontractor’s responsibility and is a statutory requirement where applicable.
  • Professional indemnity: keep appropriate cover for any design or professional services. Project cover may not replace your own PI.
  • Tools, plant and hired-in equipment: confirm who covers your equipment, and on what terms.
  • Motor: check your own vehicle and commercial motor arrangements.
  • Materials and work off site: establish whether materials, fabrication and work away from the project site are included.
  • Defective workmanship and non-negligent damage: check the policy and contract for exclusions or limitations.
  • Liability after the project policy ends: contractual responsibility may continue beyond the OCIP period, so your own cover may need to remain in place or be extended.

For contractors reviewing broader needs, Moyak’s information on General Contractor Insurance and Commercial Combined Insurance may be a useful starting point. Neither page is a substitute for checking whether a particular policy answers a specific project exposure.

A subcontractor and broker review contract and insurance documents together before signing

5. What to ask before you sign

Do not rely on a short insurance summary or the reassurance that “the project covers it”. Ask for the documents and the contractual allocation of risk before agreeing to the work.

Start with the direct questions:

  1. What is the excess for the relevant type of loss, and who has to pay it?
  2. Can my share be capped at a fixed amount or a proportion of the subcontract value?
  3. Does the contract make me responsible for the whole excess, part of it, or only losses connected to my work?
  4. Does the project policy cover my work and my business as intended, and am I listed among the named insured parties?
  5. What do my own public liability, contract works, PI, tools and plant policies actually respond to in this arrangement?

Request the full policy wording and schedule, the excess structure and the list of insured parties, not just a certificate or summary. Read the subcontract alongside the insurance documents. Look for flow-down clauses that accept a risk at main-contract level and then pass it to you, and check whether insurance savings have been deducted from your price. The Munro-Greenhalgh article cautions that such deductions can be overstated, leaving a subcontractor with more risk for less money.

If the excess allocation is unclear or unworkable, discuss possible amendments with the main contractor and obtain appropriate legal advice. Possible positions include the employer retaining the excess, sharing it between parties, or limiting your liability where joint names insurance applies. Whether any amendment is agreed will depend on the contract and project.

6. Talk to your broker before commitment

Bring your broker the draft subcontract, the project policy wording and schedule, the list of insured parties, and details of the work you will carry out. Include information on design responsibilities, off-site materials, equipment and any relevant policy excesses or exclusions.

An insurance review can help identify questions your current cover needs answered before you sign. It cannot guarantee that a policy will cover a loss: that always depends on the policy terms and the facts at the time. For subcontractors looking for Construction Contractor Insurance or Business Insurance in Essex or London, Moyak Insurance Services can discuss the risks with an individual approach and help you understand where your existing cover may fit.

OCIP arrangements vary from project to project, so the wording and contract govern. The examples above are not market averages, and this article is not legal advice on any particular subcontract. The practical next step is simple: get the documents, establish who pays the first slice of a loss, and ask your broker to review your position before you commit.